Solectria 可再生能源有限责任公司,是逆变器生产商,称其将会与DCO能源公司(是一家技术,生产建筑承包商)一起,为新泽西州提供大规模光伏逆变器系统。
项目系统中的第一系统,位于纽约Seabrook,是一个6MW项目,分成两个阶段:前3MW阶段已经在运行,并且在今年年底完成,第二个3MW,将会在2011年春季开始生产。Solectria公司将会提供12个小型逆变器。
Solectria Renewables LLC, a U.S.-based PV inverter manufacturer, says it will supply commercial and utility-scale inverters for photovoltaic systems in New Jersey in partnership with DCO Energy, an engineering, procurement and construction contractor.
The first system, located in Seabrook, N.J., is a 6 MW project divided into two phases: The first 3 MW phase is already under way and will be completed by the end of the year, and the second 3 MW phase will begin construction in spring 2011. For this project, Solectria will provide 12 of its SmartGrid inverters (SGIs).
The second system will be a 2.5 MW ground-mounted system co-located at South Jersey Industries natural-gas storage facility in McKee City, N.J. The system will be tied directly to the grid and is scheduled to begin construction in the first quarter of 2011. For this project, Solectria will provide seven of its SGIs.