of the Owner of the Project to implement the quality control procedures in each phase of the engineering ) 工程设计审查;
Engineering design review;
2) 项目建设和管理文件审查;
Control and construction documents review;
3
phase of the engineering design, material procurement, construction, commissioning and so contents are as follows:1) 工程设计审查;Engineering design review;2) 项目建设和管理文件审查;Control and construction